 Before work commenced. |  And after - a view of one of the completed extensions. |
 Front view of the two houses before work commenced. |  Demolishing the two front porches and garages that share the party wall. |
 Foundations being dug. |  Block and brick work commences. |
 New bay window being formed. |  RSJ set in to each house to carry joists and block work overhead. |
 Block and brick work finished with roofs going on. |  New granite sills set in and wrapped to protect them. |
 Adjoining house shell and carpentry first fix complete. |  Adjoining house roof on with windows and doors in. |
 Mahogany front door screen and canopy are fitted with small roof tiles to lower porch roof. |  Roof being completed to adjoining house. |
 Boundary wall built. |  View from other side. |
 View of completed extension 1. |  Completed extension 1 by night with up and down LED lights. |
 View of completed extension 2 with canopy posts set in on granite plinths. |  Completed extension 2 by night. |
 Completed extension 2 at night. |  Windows and doors put in to adjoining house. |
 New driveway being set in. |  Completed extension and driveway. |
 Completed extension different angle. |  View of completed job from inside showing walnut floors, doors, frames, skirting boards and vertical column radiator. |
 Walnut bookcase. |  Glazed walnut double doors maximising light with blue LED floor lights. |
 Close-up of walnut bookcase. |  Walnut double doors. |
 View through doors. |  Different angle view. |
 Close-up of floor. |  Closeup of walnut double doors. |
 View of completed job from inside showing walnut floors, doors, frames, skirting boards and vertical column radiator. |